Ken Mattingly was moved through the aid crew into parallel schooling with Anders as backup CMP just in case Apollo eleven was delayed past its supposed July launch date, at which place Anders can be unavailable.[59]Upon arrival with the Vertical Assembly Making, Every single phase was inspected in a very horizontal position right before getting ori